Build the installation run sheet around the approved opening time
Sequence delivery, protection, assembly, positioning, graphics, lighting, product loading, cleaning and inspection backwards from reopening. Record the fixture ID, crew owner, delivery sequence, installation dependency and acceptance owner for every physical element.
Accept and close defects by fixture ID
Inspect position, level, stability, product fit, graphics, lighting, cables, customer reach and staff access. Classify each check as pass, conditional acceptance or defect, then assign the correction and retain photographic close-out evidence.
Complete an opening-ready handover
Give the retail team the accepted fixture list, product-loading reference, operating notes, open-defect status and touch-up contacts before customers arrive. Review my display installation plan.